Awaab's Law Phase 2 - What Social Landlords Need To Do Before 30th November 2026

Awaab’s Law Phase 2 – What Social Landlords Need To Do Before 30th November

From 30th November 2026, phase 2 of Awaab’s Law extends the requirements for investigating and making safe significant hazards in social rented homes in England. For housing associations and local authorities, a useful test is to follow a report from the moment it comes in. Who decides how urgent it is, who can attend, and who keeps the tenant informed?

Awaab’s Law is named in memory of Awaab Ishak, who died aged two in 2020 after prolonged exposure to mould in his home. The first phase, which came into force in October 2025, introduced fixed timescales for all emergency hazards and for damp and mould that presents a significant risk of harm.

What Changes Under Phase 2?

The significant hazard requirements expand to cover fire and explosions, electrical hazards, excess cold and heat, structural collapse and falling elements, falls on level surfaces, on stairs or between levels, and domestic hygiene, including personal hygiene and food safety. The existing duties on emergency hazards and significant damp and mould continue.

The urgency depends on the circumstances in the home. A report of a broken smoke alarm or a socket that shows signs of scorching needs to be assessed alongside what the tenant describes, which safeguards are still working and whether anyone in the household is particularly at risk.

The Deadlines Landlords Need To Plan For:

  • Potential emergency hazard. Investigate and, if confirmed, make safe as soon as reasonably practicable and within 24 hours of becoming aware of the potential emergency.
  • Potential significant hazard. Investigate within 10 working days of becoming aware of it. If confirmed, make the home safe within five working days of completing the investigation.
  • Written findings. Give the tenant a written summary within three working days of completing the investigation, where required.
  • Preventing recurrence. Start or take steps to start any required preventative work within five working days of completing the investigation that identified the hazard. If work cannot start in that time, start it as soon as reasonably practicable and within 12 weeks. Complete it within a reasonable period.
  • Temporary accommodation. If the home cannot be made safe within the applicable deadline, secure suitable alternative accommodation for the household at the landlord’s expense until it is safe to return.

Read the GOV.UK phase 2 guidance for social landlords

Where Fire Safety Reports Should Go

A fire hazard within a home, such as a missing or faulty smoke alarm, can fall within Awaab’s Law. Fire hazards in common areas already covered by the Fire Safety Order, such as an obstructed communal escape route, should be routed to the building’s Responsible Person or acted on by the landlord if it holds that role. Where a report raises concerns both inside a home and in the common areas, make sure each issue reaches the team responsible for dealing with it.

Read the GOV.UK guidance on assessing and triaging hazards

Have fire safety actions outstanding? EA-RS can help you scope fire door repairs and work on fire alarms or smoke detection. Discuss your outstanding fire safety works

Four Checks To Make Before 30th November:

  1. Test what happens when a tenant reports a hazard. Use a real example, such as a report of a socket that smells of burning on a Friday evening. Check whether the person taking the call knows what to ask, how to record when the landlord became aware, and who can make an out-of-hours decision.
  2. Check who can attend and make the home safe. Confirm access to competent fire safety specialists and electricians, along with back-up cover. Agree who can authorise urgent works and arrange suitable accommodation if the household needs to move temporarily.
  3. Review open repairs and inspection findings. Check whether outstanding reports or recent inspection findings need reassessing in light of the risk to the household. Assign an owner and make sure the person investigating can see previous visits and attempted repairs.
  4. Follow the job through to the tenant update. Check that the contractor’s findings reach the housing team promptly. Record what was done to make the home safe, what still needs to happen and when the tenant was told.

How EA-RS Can Help

EA-RS works with housing associations and local authorities on fire and life safety across social housing portfolios. Our teams install, test and maintain fire alarms, smoke detection and emergency lighting. We also carry out fire door inspections and remedial works to support landlords’ wider fire safety programmes.

Planning inspections, testing or remedial works across your housing stock? Tell us which properties and systems are involved and what your latest inspections found. We can help you scope the work and discuss delivery options.

Talk to EA-RS about your housing portfolio

Related Articles